March 2017 Construction Update

March Madness brought great strides.  Workers focused on building 4 cottages and training the team on the Endura Block System.  

The Endura wall system is made up of a Concrete Masonry Unit (CMU) with two layers of foam insulation inside.  It is environmentally friendly, durable, rodent and rot proof, cost competitive, sound deadening, and fire resistant.

Silt Fence being installed and completed

Plastering Walls

Currently Seaside Cottages #14, #10, #9, and #11 are ready for roofs. 

Engineers have been busy getting the final changes in for the wastewater drainage and treatment plant as well as the electrical network engineering and the fresh water system.

Seaside Cottage #9


Seaside Cottage #10


Seaside Cottage #11


Seaside Cottage #12